Projects

Inovus Building Solution
MALVAR BATANGAS - UNCRATING,ASSEMBLY,LIFTING AND POSITIONING OF AHU

FCIE (Dasmariñas Cavite)

KRAH PIPES - OFFLOADING AND POSITIONING OF MACHINE

JTI
MALVAR BATANGAS - LIFTING,HAULING AND ASSEMBLY OF CHILLER 

Filinvest
ALABANG - LIFTING OF CHILLER

Prime Power

SKY REGENCY RESIDENCES – LIFTING,HAULING AND POSITIONING OF GENERATOR SET

Inovus Building Solution

THE FORT – LIFTING,HAULING,POSITIONING AND WIRING OF CHILLER AND VFD

Galleon

GLOBALAIRE – LIFTING,HAULING AND POSITIONING 

Batangas

OFFLOADING

Siix Calamba Laguna

INGASCO – ERECTION AND POSITIONING OF VIE TANK AND AMBIENT VAPORIZER

Stanley Electric Philippines(Dasmariñas Cavite)

PULL-OUT,TRANSPORT,OFFLOADING,HAULING-IN, AND POSITIONING OF INJECTION MOLDING

Kinpo SLMP Fpip

STRIPPING,UNLOADING,UNCRATING,HAULING AND POSITIONING

La salle

HAULING,LIFTING,LOADING AND DELIVERY

Royale Pharma

STRIPPING,UNLOADING,HAULING AND POSITIONING

Steel Crates

LIFTING,UNCRATING,HAULING AND POSITIONING

Pepsi Cola Philippines Sta Tomas Batangas

 HAULING,UNLOADING AND POSITIONING OF ASSORTED CARGO

 

Valenzuela City

UNLOADING OF CARGO

Selecta
 LIFTING OF TANK   

DDT
LIFTING OF TRANSFORMER USING SQUARE FRAME     

North Edsa

 HAULING,LIFTING AND POSITIONING OF TRANSFORMER AND SWITCH GEAR

Technoalloy Dasmariñas Cavite
 RELOCATION OF MACHINE

Kawit
GEA - POSITIONING OF CONDENSER

Kou Fu Carmona
LIFTING

 TRANSFER OF MRI AND OTHER HOSPITAL EQUIPMENT

Silang Project

Tanza

 UNLOADING OF CHILLER

We Provide the Best Service in Industry​